Background:
The Construction of a new modern Workshop and Retail Unit, aimed at complementing and modernising this particular area of the City.
Description of works:
The works comprised of the construction of a raft foundation with vast quantities of steel mesh inserted and finished concrete floors. The superstructure was erected using steel portal frame with a double skin insulated roof panel. External walls were constructed using a “breeze block” and dry-lined, glass blocks, structural glazing, stone cladding & plaster work with a large sliding timer door. A Brise Soleil panel was installed above the structural glazing with a Tegral sheeted panel fitted as a fascia and soffit board/s. The internal works entailed the complete fit-out and décor.
Key services undertaken:
- Some demolition
- Drainage
- Concrete works
- Shuttering / concrete finishes
- Block-work
- Structural steel & roof cladding
- Dry-lining
- Electrical fit out
- Mechanical fit-out
- Plaster finishes
- Joinery
- Complete fit out
- Site services
- Street lighting
- Paving